Live Generation & Schedule Dashboard

Block-by-block solar forecast, SLDC schedule, and live telemetry for 30 Sep 2026

Day-Ahead Cut-off: 18:00 (4h 30m)
A
Forecast Today+3.1% vs D-1
816.8 MWh
Portfolio Peak: 114.2 MW at 12:45
Scheduled to SLDCRev 2 (07:30)
804.7 MWh
Net Consumer Schedule
Actual GeneratedUp to 13:00
531.1 MWh
Live Actuals (52 Blocks)
Forecast ErrorWeek avg 4.2%
19.6% MAPE
✓ Within 10% Safe Band
Est. DSM Liability50.02 Hz
₹2.14 Lakh
Estimated Settlement for 03 Oct
Weekly Net:₹7.19 L

Forecast, Schedule & Actual Generation

15-minute time block comparison (Block 1 00:00 to Block 96 23:45)

Forecast (v3)
Schedule to SLDC (Rev 2)
Actual Telemetry
Hover over chart or strip to inspect 15-min block values
030609012000:0004:0008:0012:0016:0020:0023:45
96-Block DSM Deviation Heatmap (Real-Time Timeline)
<5% (Safe) 5-10% >10% (Risk) Future
00:00 (B1)06:00 (B24)13:00 (B52 NOW)18:00 (B72)24:00 (B96)

Consumer-Wise Allocation & Schedule Share

Daily apportionment of 804.7 MWh scheduled power across 6 C&I offtakers

Offtaker ConsumerDaily Schedule (MWh)Peak Capacity (MW)Portfolio ShareDemand Status
Jindal Stainless Limited (JSL)281.4 MWh10.2 MW35%Accepted
Arya Iron and Steel Co. (AISCO)174.4 MWh6.3 MW22%Accepted
Emami Paper Mills Limited132.2 MWh4.8 MW16%Accepted
Hindustan Coca Cola Beverages (HCCB)104.1 MWh3.8 MW13%Accepted
Bharti Airtel Limited (Chandaka GSS)56.3 MWh2.1 MW7%Pending
Parle Agro Private Limited56.3 MWh2 MW7%Changes requested

Needs Attention

4 Open

Forecast v3 is awaiting Ampin approval before 17:00 cut-off.

2 offtaker demands require Ampin review or revision approval.

Ampin OD1 Solar (132 kV Balangir) telemetry packet interval exceeded 15 mins.

Generation Plants Right Now

3 Sites
Ampin OD1 Solar (Balangir)132 kV OPTCL LILO Substation, Dhubalpada, Odisha
Online
Live: 26.3 MW of 30 MWAvail: 99.1%
Ampin OD3 Solar (Balangir)132 kV OPTCL LILO Substation, Dhubalpada, Odisha
Online
Live: 38.9 MW of 40 MWAvail: 98.4%
Ampin Sindari SolarSindari Solar Park, Rajasthan
Online
Live: 34.2 MW of 50 MWAvail: 95.8%

Recent Activity Feed

09:12

Plant telemetry packet delay: Ampin OD1 Solar (132 kV Balangir) interval exceeded 15 mins

Renewalytics, Ampin Site O&M•Portal, Email
08:40

Offtaker revised peak demand: Parle Agro requested revision from 2.0 MW to 2.2 MW

Ampin, Renewalytics•Portal, WhatsApp
08:05

High deviation alert at Block 31 (07:30): Actual generation 31.0 MW vs Schedule 19.2 MW (DSM rate Rs 2.15/kWh)

Renewalytics, Ampin•Portal, Email, WhatsApp
07:30

Day-ahead schedule Revision 2 successfully submitted to SLDC Odisha and dispatched to JSL, AISCO, Emami, HCCB

SLDC, Ampin, Offtakers•Email